The LOLEWG reviews and provides recommendations to MISO on the methodology and input assumptions to be used in performing the Loss of Load Expectation (LOLE) analysis that calculates the Planning Reserve Margin (PRM) requirements for each Load Serving Entity (LSE) within the MISO as defined in Module E of MISO Transmission & Energy Markets Tariff.