MISO is requesting feedback on the 2023 NERC Lessons Learned Topics Survey. Using the table below, please reply with a list of your top four (4) Lessons Learned topics for 2023, with 1 being your first choice, 2 being your 2nd choice, etc. Please click the following link for additional details regarding the 2022 Lessons-Learned.

2022 NERC Lessons Learned Topic (Title)

Category

Select 4 Topics
(1, 2, 3, 4)

Preventing Unwanted Operations during Relay Diagnostic Restarts

Relaying and Protection Systems

 

Loss of Energy Management System Functionality due to Server Resource Deadlock

Communications

 

EMS Pausing During Database Deployment

Communications

 

Tower Climber Incident

Transmission Facilities,
Bulk-Power System Operations

 

Forecasted High Winds

Generation Facilities,
Transmission Facilities,
Bulk-Power System Operations

 

Intermittent Network Connection Causes EMS Disruption

Communications

 

Unintended Consequences of Altering Protection System Wiring to Accommodate Failing Equipment

Transmission Facilities

 

Substation Flooding Events Highlight Potential Design Deficiencies

Transmission Facilities

 

Model Data Error Impacts State Estimator and Real-Time Contingency Analysis Results

Communications

 

Islanding and Insufficient Primary Frequency Response Resulted in Unintended UFLS

Generation Facilities,
Bulk-Power System Operations

 

Distributed Energy Resource Performance Characteristics during a Disturbance

Generation Facilities,
Transmission Facilities,
Bulk-Power System Operations

 

Managing UFLS Obligations and Service to Critical Loads during an Energy Emergency

Bulk-Power System Operations

 

 

Please provide feedback by December 16, 2022. 


Submitted Feedback

WPPI’s top 4 lessons learned topics for 2023 are as follows (with 1 being our 1st choice, etc.):

1. Managing UFLS Obligations and Service to Critical Loads during an Energy Emergency

2. Distributed Energy Resource Performance Characteristics during a Disturbance

3. Preventing Unwanted Operations during Relay Diagnostic Restarts

4. Islanding and Insufficient Primary Frequency Response Resulted in Unintended UFLS

1. Model Data Error Impacts State Estimator and Real-Time Contingency Analysis Results

2. Managing UFLS Obligations and Service to Critical Loads during an Energy Emergency

3. Intermittent Network Connection Causes EMS Disruption

4. Preventing Unwanted Operations during Relay Diagnostic Restarts

  1. DER performance characteristic during a Disturbance
  2. Preventing Unwanted Operations during Relay Diagnostics Restarts
  3. Managing UFLS Obligations and Service to Critical Loads during an Energy Emergency
  4. Forecasted High Winds